Friday 3 May 2013

Awesome -First floor almost ready

Well everyone, the building continues to get more and more finished. I was granted another peek inside the other day and I must say it is looking nice. The exterior is starting to be completed with gravel being loaded on top of the undercoating which will be followed in the next week or so with the final asphalt. My thanks to Alex for the latest tour.

You can see the gravel in this photo:



As far as inside goes, the first floor is well on its way and should be easily ready for occupancy in a few short weeks. Here is a picture of the hallway:


And someone has their kitchen in already:


And someone else's bathroom:


Our main doors look really nice I think:


Front closet doors are standard fare mirrored:


I'll post some more pictures in a few days. As well, look for first floor finished photos in a couple of weeks!




3 comments:

  1. Does anyone know if we are allowed BBQ's

    ReplyDelete
  2. How do I find out how big the storage lockers are?

    ReplyDelete
  3. I believe the size is in your contract papers Chris, typically about 4ft x 6ft. I did find out they will be wire mesh style and not wall board of some type.

    ReplyDelete